GUIDE TO ENFORCEMENT UNDER THE CONSTRUCTION CONTRACTS ACT 2002

Download a copy of our Guide to Enforcement under the Construction Contracts Act 2002 today

There are several ways for a party to enforce an adjudication determination under the Construction Contracts Act 2002 (the Act).  

An adjudicator’s determination can also (in some circumstances) be challenged through judicial review in the High Court.

This Guide is intended to provide a summary of ways to enforce a determination made under the Construction Contracts Act and should be read alongside the Building Disputes Tribunal Guide to Resisting Enforcement under the Construction Contracts Act 2002.

Our thanks to our contributors to the Guide: