28 FEBRUARY 2021: IMPORTANT NOTICE

x

In line with Ministry of Health guidance, our staff are currently working remotely. They remain available to assist and it is business as usual. However, we ask that wherever possible you contact us online or by email (registrar@buildingdisputestribunal.co.nz).

If you need to courier documents, please contact our Registry staff in the first instance to confirm the appropriate delivery details.

He waka eke noa.

Albert Yeu

MSc | BEng | LLB | PGDipArb | PGDipICL

Service: Arbitration, Mediation, Dispute Review Boards

Area of Expertise: Residential Construction, Commercial and Industrial Construction, Infrastructure and Civil Works, Quantity Surveying, Engineering, Design

Chartered civil engineer and chartered project management surveyor with extensive experience in design and construction of tunnel, bridge, highway, water and flood prevention scheme in Hong Kong.

Experienced in consultancy procurement and tendering for a variety of construction contracts.

Accredited NEC3 ECC Project Manager.

Experienced with NEC3 ECC, remeasurement type, works order type, lump sum with BoQ and design&build contracts.

Legally trained arbitrator (HKIAC), adjudicator, mediator and expert witness in the UK, Malaysia, Australia and Hong Kong.

Construction Arbitrator in engineering and construction disputes in general civil engineering works, roads and drainage, water, bridges, tunnel and highway sectors.

Regularly appointed arbitrator, construction adjudicator and mediator.